Cemetery Road Metrolink station

 Cemetery Road
Manchester Metrolink
Location
Place Droylsden
Local authority Metropolitan Borough of Tameside
Platforms 2
Fare zone information
Metrolink Zone
Present status Proposed station
History
Opening Summer 2012
UK Trams portal

Cemetery Road Metrolink Station is a future station proposed in Phase 3b of the Manchester Metrolink. The station is scheduled to open in the summer of 2012[1] and will be located on the East Manchester line on Manchester at the junction of Cemetery Road[2].

Services

Trams are scheduled along the East Manchester line westbound towards Manchester Piccadilly station before continuing through the city centre towards other destinations, whilst eastbound trams will head towards Ashton-under-Lyne. Trams will run every 12 minutes Monday-Saturday daytime, increasing to every 6 minutes at peak times. On Sundays and Bank Holidays, there will be a 15 minute service[1].

Preceding station   Manchester Metrolink   Following station
    Under Construction    
East Manchester Line

References

External links